Pile Head Cutting and Trimming — Inspection and Test Plan

Pile Head Cutting and TrimmingCivil

ACT-021 / ITP / R00

Pile Head Cutting and Trimming — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Mark cut-off and retained cage—————
Trim under approved method—————
Inspect interface before pile-cap work—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: cut-off markers and approved trimming tools

Inspection sequence

  • Mark cut-off and retained cage
  • Trim under approved method
  • Inspect interface before pile-cap work

Inspection controls

  • Cut-off survey, exposed concrete and retained rebar
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________