Pile Head Cutting and Trimming — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Mark cut-off and retained cage | — | — | — | — | — |
| Trim under approved method | — | — | — | — | — |
| Inspect interface before pile-cap work | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: cut-off markers and approved trimming tools
Inspection sequence
- Mark cut-off and retained cage
- Trim under approved method
- Inspect interface before pile-cap work
Inspection controls
- Cut-off survey, exposed concrete and retained rebar
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________