Skip to content

Risk AssessmentACT-021-RAR00Available

Pile Head Cutting and Trimming — Risk Assessment

Pile Head Cutting and TrimmingCivil

ACT-021 / RA / R00

Pile Head Cutting and Trimming — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Mark cut-off and retained cage—————
Trim under approved method—————
Inspect interface before pile-cap work—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: cut-off markers and approved trimming tools

Task risk review

  • Mark cut-off and retained cage
  • Trim under approved method
  • Inspect interface before pile-cap work

Assessment prompts

  • Assess interfaces relevant to this location: Excavation edges, underground services and mobile plant.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3