ACT-021 / CHK / R00
Pile Head Cutting and Trimming — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Mark cut-off and retained cage | — | — | — | — | — |
| Trim under approved method | — | — | — | — | — |
| Inspect interface before pile-cap work | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: cut-off markers and approved trimming tools
Inspection points
- Mark cut-off and retained cage
- Trim under approved method
- Inspect interface before pile-cap work
Records and release
- Cut-off survey, exposed concrete and retained rebar
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________