ACT-013 / CHK / R00
Site Clearance and Grubbing — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Mark services and retained vegetation | — | — | — | — | — |
| Clear limits | — | — | — | — | — |
| Segregate arisings | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: survey pegs, clearance plant and tree protection
Inspection points
- Mark services and retained vegetation
- Clear limits
- Segregate arisings
Records and release
- Clearance boundary, retained assets and disposal tickets
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________