ACT-022 / CHK / R00
Blinding Concrete — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release formation | — | — | — | — | — |
| Establish limits and levels | — | — | — | — | — |
| Place and protect blinding | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved blinding mix and level guides
Inspection points
- Release formation
- Establish limits and levels
- Place and protect blinding
Records and release
- Thickness, level and release for next layer
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________