ACT-022 / ITP / R00
Blinding Concrete — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release formation | — | — | — | — | — |
| Establish limits and levels | — | — | — | — | — |
| Place and protect blinding | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved blinding mix and level guides
Inspection sequence
- Release formation
- Establish limits and levels
- Place and protect blinding
Inspection controls
- Thickness, level and release for next layer
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________