Dewatering Works — Inspection Checklist

Dewatering WorksCivil

ACT-017 / CHK / R00

Dewatering Works — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Release discharge—————
Establish baseline—————
Monitor approved drawdown and standby arrangements—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: sumps or wells, pumps and piezometers

Inspection points

  • Release discharge
  • Establish baseline
  • Monitor approved drawdown and standby arrangements

Records and release

  • Water levels, discharge quality and shutdown release
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.