ACT-017 / CHK / R00
Dewatering Works — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release discharge | — | — | — | — | — |
| Establish baseline | — | — | — | — | — |
| Monitor approved drawdown and standby arrangements | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sumps or wells, pumps and piezometers
Inspection points
- Release discharge
- Establish baseline
- Monitor approved drawdown and standby arrangements
Records and release
- Water levels, discharge quality and shutdown release
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________