ACT-017 / ITP / R00
Dewatering Works — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release discharge | — | — | — | — | — |
| Establish baseline | — | — | — | — | — |
| Monitor approved drawdown and standby arrangements | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sumps or wells, pumps and piezometers
Inspection sequence
- Release discharge
- Establish baseline
- Monitor approved drawdown and standby arrangements
Inspection controls
- Water levels, discharge quality and shutdown release
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________