ACT-026 / ITP / R00
Pile Caps and Grade Beams — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Accept trimmed heads | — | — | — | — | — |
| Check grade beam continuity | — | — | — | — | — |
| Inspect cages and forms before pour | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: cages, starters, formwork and concrete
Inspection sequence
- Accept trimmed heads
- Check grade beam continuity
- Inspect cages and forms before pour
Inspection controls
- Pile-to-cap detail, anchorage, cover and survey
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________