ACT-026 / RA / R00
Pile Caps and Grade Beams — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Accept trimmed heads | — | — | — | — | — |
| Check grade beam continuity | — | — | — | — | — |
| Inspect cages and forms before pour | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: cages, starters, formwork and concrete
Task risk review
- Accept trimmed heads
- Check grade beam continuity
- Inspect cages and forms before pour
Assessment prompts
- Assess interfaces relevant to this location: Excavation edges, underground services and mobile plant.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________