Diaphragm Wall Construction — Inspection and Test Plan

Diaphragm Wall ConstructionCivil

ACT-016 / ITP / R00

Diaphragm Wall Construction — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release guide walls—————
Verify panel excavation—————
Coordinate reinforcement cage and specialist concreting—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: grab, support fluid, cage and tremie

Inspection sequence

  • Release guide walls
  • Verify panel excavation
  • Coordinate reinforcement cage and specialist concreting

Inspection controls

  • Depth, verticality, support-fluid properties and panel concrete volumes
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.