ACT-023 / ITP / R00
Below-Grade Waterproofing (Membrane) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release substrate | — | — | — | — | — |
| Treat corners, penetrations and laps | — | — | — | — | — |
| Inspect before protection and backfill | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: primer, membrane and protection boards
Inspection sequence
- Release substrate
- Treat corners, penetrations and laps
- Inspect before protection and backfill
Inspection controls
- Product compatibility, seam checks and concealed photographs
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________