ACT-023 / CHK / R00
Below-Grade Waterproofing (Membrane) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release substrate | — | — | — | — | — |
| Treat corners, penetrations and laps | — | — | — | — | — |
| Inspect before protection and backfill | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: primer, membrane and protection boards
Inspection points
- Release substrate
- Treat corners, penetrations and laps
- Inspect before protection and backfill
Records and release
- Product compatibility, seam checks and concealed photographs
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________