ACT-024 / CHK / R00
Anti-Termite Treatment — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release substrate | — | — | — | — | — |
| Confirm authorised applicator and approved label | — | — | — | — | — |
| Protect recorded treated zones | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved treatment and metered applicator
Inspection points
- Release substrate
- Confirm authorised applicator and approved label
- Protect recorded treated zones
Records and release
- Batch, coverage, treatment certificates and re-treatment areas
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________