ACT-024 / ITP / R00
Anti-Termite Treatment — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release substrate | — | — | — | — | — |
| Confirm authorised applicator and approved label | — | — | — | — | — |
| Protect recorded treated zones | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved treatment and metered applicator
Inspection sequence
- Release substrate
- Confirm authorised applicator and approved label
- Protect recorded treated zones
Inspection controls
- Batch, coverage, treatment certificates and re-treatment areas
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________