Search
Find a document, activity or package
Practical queries work: floor tile WIR, material inspection, ACT-130, TAB, O&M.
183 results
Documents 8
Work Inspection RequestACT-006
Tower Crane Installation and Climbing Release
Tower Crane Installation, Climbing and Dismantling · Project Management
Work Inspection RequestACT-035
Concrete Pre-Pour Release Checklist
Concrete Pouring (General) · Structural
Work Inspection RequestACT-056
Roof Drain and Membrane Interface Checklist
Roof Waterproofing and Insulation · Structural
Work Inspection RequestACT-062
Floor Tile Installation Checklist
Floor Tiling (Ceramic / Porcelain) · Architectural
Work Inspection RequestACT-065
Washroom Waterproofing Inspection and Release
Wet Area Waterproofing · Architectural
Work Inspection RequestACT-074
Fire-Rated Door Assembly Inspection
Steel / Fire-Rated Doors Installation · Architectural
Work Inspection RequestACT-134
Switchgear and Electrical Panel Inspection
MV / LV Switchgear and Panels Installation · Electrical
Work Inspection RequestACT-158
Interlock Paving Installation Checklist
Interlock Paving · Infrastructure
Activities 170
Site Mobilisation and Site Establishment
Project Management · Before Construction
Setting Out and Survey Works
Project Management · Before Construction
Site Hoarding and Gates Installation
Project Management · Before Construction
Temporary Site Offices and Facilities
Project Management · Before Construction
Temporary Power and Water Supply
Project Management · Before Construction
Tower Crane Installation, Climbing and Dismantling
Project Management · Before Construction
Passenger/Material Hoist Installation and Dismantling
Project Management · Before Construction
Mobile Crane Lifting Operations
Project Management · Before Construction
Scaffolding Erection and Dismantling
Project Management · Before Construction
Packages 5
Floor and wet-area finishes
Screeding, porcelain floor tiling and wet-area waterproofing, from method statement through inspection records.
Foundations and concrete quality
Pile integrity testing, concrete pouring inspection and roof waterproofing records for the structural package.
Services inspections
Material receipt for the air handling units, switchgear inspection and duct leakage testing.
Commissioning and testing
Facade water testing, duct leakage, TAB and lift commissioning records in one set.
Handover closeout
As-built drawings, snagging, O&M training and the project handover records.