Library / Documents
Document library
Every catalogue record, marked Available when a file can be downloaded now and Planned when it is not written yet. Available files are listed first.
170 documents · 170 available
Showing 50 of 170
Method StatementACT-001
Site Mobilisation and Site Establishment Method Statement
Site Mobilisation and Site Establishment · Project Management
Method StatementACT-002
Setting Out and Survey Works Method Statement
Setting Out and Survey Works · Project Management
Method StatementACT-003
Site Hoarding and Gates Installation Method Statement
Site Hoarding and Gates Installation · Project Management
Method StatementACT-004
Temporary Site Offices and Facilities Method Statement
Temporary Site Offices and Facilities · Project Management
Method StatementACT-005
Temporary Power and Water Supply Method Statement
Temporary Power and Water Supply · Project Management
Method StatementACT-006
Tower Crane Installation, Climbing and Dismantling Method Statement
Tower Crane Installation, Climbing and Dismantling · Project Management
Method StatementACT-007
Passenger/Material Hoist Installation and Dismantling Method Statement
Passenger/Material Hoist Installation and Dismantling · Project Management
Method StatementACT-008
Mobile Crane Lifting Operations Method Statement
Mobile Crane Lifting Operations · Project Management
Method StatementACT-009
Scaffolding Erection and Dismantling Method Statement
Scaffolding Erection and Dismantling · Project Management
Method StatementACT-010
Temporary Works (Propping and Back-Propping) Method Statement
Temporary Works (Propping and Back-Propping) · Project Management
Method StatementACT-011
Traffic Management and Site Logistics Method Statement
Traffic Management and Site Logistics · Project Management
Method StatementACT-012
Demobilisation and Site Clearance Method Statement
Demobilisation and Site Clearance · Project Management
Method StatementACT-013
Site Clearance and Grubbing Method Statement
Site Clearance and Grubbing · Civil
Method StatementACT-014
Excavation Works Method Statement
Excavation Works · Civil
Method StatementACT-015
Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) Method Statement
Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) · Civil
Method StatementACT-016
Diaphragm Wall Construction Method Statement
Diaphragm Wall Construction · Civil
Method StatementACT-017
Dewatering Works Method Statement
Dewatering Works · Civil
Method StatementACT-018
Bored Piling Works Method Statement
Bored Piling Works · Civil
Method StatementACT-019
Pile Load Testing (Static / Dynamic) Method Statement
Pile Load Testing (Static / Dynamic) · Civil
Method StatementACT-020
Pile Integrity Testing Method Statement
Pile Integrity Testing · Civil
Method StatementACT-021
Pile Head Cutting and Trimming Method Statement
Pile Head Cutting and Trimming · Civil
Method StatementACT-022
Blinding Concrete Method Statement
Blinding Concrete · Civil
Method StatementACT-023
Below-Grade Waterproofing (Membrane) Method Statement
Below-Grade Waterproofing (Membrane) · Civil
Method StatementACT-024
Anti-Termite Treatment Method Statement
Anti-Termite Treatment · Civil
Method StatementACT-025
Raft Foundation Construction Method Statement
Raft Foundation Construction · Civil
Method StatementACT-026
Pile Caps and Grade Beams Method Statement
Pile Caps and Grade Beams · Civil
Method StatementACT-027
Backfilling and Compaction Method Statement
Backfilling and Compaction · Civil
Method StatementACT-028
Soil Compaction Testing (Field Density Test) Method Statement
Soil Compaction Testing (Field Density Test) · Civil
Method StatementACT-029
Formwork for Columns and Walls Method Statement
Formwork for Columns and Walls · Structural
Method StatementACT-030
Formwork for Slabs and Beams Method Statement
Formwork for Slabs and Beams · Structural
Method StatementACT-031
Core Wall Jump Form / Climbing Form System Method Statement
Core Wall Jump Form / Climbing Form System · Structural
Method StatementACT-032
Table Form / Flying Form System Method Statement
Table Form / Flying Form System · Structural
Method StatementACT-033
Reinforcement Steel Fixing Method Statement
Reinforcement Steel Fixing · Structural
Method StatementACT-034
Mechanical Couplers (Rebar Splicing) Method Statement
Mechanical Couplers (Rebar Splicing) · Structural
Method StatementACT-035
Concrete Pouring (General) Method Statement
Concrete Pouring (General) · Structural
Method StatementACT-036
Mass Concrete Pouring (Raft) Method Statement
Mass Concrete Pouring (Raft) · Structural
Method StatementACT-037
Concrete Pumping Works Method Statement
Concrete Pumping Works · Structural
Method StatementACT-038
Hot Weather Concreting Method Statement
Hot Weather Concreting · Structural
Method StatementACT-039
Concrete Curing Method Statement
Concrete Curing · Structural
Method StatementACT-040
Construction Joints and Waterstops Method Statement
Construction Joints and Waterstops · Structural
Method StatementACT-041
Post-Tensioned Slabs Method Statement
Post-Tensioned Slabs · Structural
Method StatementACT-042
Precast Concrete Elements Installation Method Statement
Precast Concrete Elements Installation · Structural
Method StatementACT-043
Hollow Core Slab Installation Method Statement
Hollow Core Slab Installation · Structural
Method StatementACT-044
Concrete Repair Works Method Statement
Concrete Repair Works · Structural
Method StatementACT-045
Core Drilling and Coring Tests Method Statement
Core Drilling and Coring Tests · Structural
Method StatementACT-046
Embedded Items and Sleeves Installation Method Statement
Embedded Items and Sleeves Installation · Structural
Method StatementACT-047
Staircase Construction Method Statement
Staircase Construction · Structural
Method StatementACT-048
Shear Walls and Lift Cores Method Statement
Shear Walls and Lift Cores · Structural
Method StatementACT-049
Water Tanks (Concrete) Construction Method Statement
Water Tanks (Concrete) Construction · Structural
Method StatementACT-050
Formwork Striking and Removal Method Statement
Formwork Striking and Removal · Structural