Scope and project location

  • Activity: Shear Walls and Lift Cores. Discipline: Concrete Structure.
  • Applicable work limits / project / area / grid / exclusions: ____________________

Approved references and technical limits

  • Drawing and revision / specification clause / approved ITP: ____________________
  • Approved engineering design / manufacturer procedure / technical limits / project instructions where applicable: ____________________
  • Permits / isolations / specialist and authority releases as applicable: ____________________

Responsibilities and resources

  • Supervisor / specialist lead / safety lead / QC / consultant witness: ____________________
  • Materials and equipment: survey targets, rebar and opening formers.
  • Approved submittals / equipment IDs and calibration: ____________________

Prerequisites and work sequence

  • Prior-work release / interfaces / access / pre-task briefing: ____________________
  • 1. Transfer core controls.
  • 2. Verify cage and openings.
  • 3. Survey each lift after stripping.

Inspection stages and required records

  • Checks and evidence: Core verticality, shaft dimensions and embedded brackets.
  • Before / during / final inspection: area, acceptance clause, frequency, hold or witness point and record reference: ____________________
  • Nonconformance / corrective action / retest reference: ____________________

Approval

  • Prepared by / reviewed by / approved by / signatures and dates: ____________________