Inspection and Test PlanACT-048-ITPR00Available

Shear Walls and Lift Cores — Inspection and Test Plan

Shear Walls and Lift CoresStructural

ACT-048 / ITP / R00

Shear Walls and Lift Cores — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Transfer core controls—————
Verify cage and openings—————
Survey each lift after stripping—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: survey targets, rebar and opening formers

Inspection sequence

  • Transfer core controls
  • Verify cage and openings
  • Survey each lift after stripping

Inspection controls

  • Core verticality, shaft dimensions and embedded brackets
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.