| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Transfer core controls | — | — | — | — | — |
| Verify cage and openings | — | — | — | — | — |
| Survey each lift after stripping | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: survey targets, rebar and opening formers
Task risk review
- Transfer core controls
- Verify cage and openings
- Survey each lift after stripping
Assessment prompts
- Assess interfaces relevant to this location: Temporary stability, elevated work and material handling.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________