Demobilisation and Site Clearance Method Statement

Demobilisation and Site ClearanceProject Management

ACT-012 / MS / R00

Demobilisation and Site Clearance Method Statement

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Scope and project location

  • Activity: Demobilisation and Site Clearance. Discipline: Preliminaries & Enabling Works.
  • Applicable work limits / project / area / grid / exclusions: ____________________

Approved references and technical limits

  • Drawing and revision / specification clause / approved ITP: ____________________
  • Approved engineering design / manufacturer procedure / technical limits / project instructions where applicable: ____________________
  • Permits / isolations / specialist and authority releases as applicable: ____________________

Responsibilities and resources

  • Supervisor / specialist lead / safety lead / QC / consultant witness: ____________________
  • Materials and equipment: isolation tags, waste containers and reinstatement materials.
  • Approved submittals / equipment IDs and calibration: ____________________

Prerequisites and work sequence

  • Prior-work release / interfaces / access / pre-task briefing: ____________________
  • 1. Release area.
  • 2. Isolate services before removing facilities.
  • 3. Reinstate affected access and finishes.

Inspection stages and required records

  • Checks and evidence: Removal list, waste tickets and returned condition.
  • Before / during / final inspection: area, acceptance clause, frequency, hold or witness point and record reference: ____________________
  • Nonconformance / corrective action / retest reference: ____________________

Approval

  • Prepared by / reviewed by / approved by / signatures and dates: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.