ACT-012 / CHK / R00
Demobilisation and Site Clearance — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release area | — | — | — | — | — |
| Isolate services before removing facilities | — | — | — | — | — |
| Reinstate affected access and finishes | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: isolation tags, waste containers and reinstatement materials
Inspection points
- Release area
- Isolate services before removing facilities
- Reinstate affected access and finishes
Records and release
- Removal list, waste tickets and returned condition
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________