ACT-012 / ITP / R00
Demobilisation and Site Clearance — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release area | — | — | — | — | — |
| Isolate services before removing facilities | — | — | — | — | — |
| Reinstate affected access and finishes | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: isolation tags, waste containers and reinstatement materials
Inspection sequence
- Release area
- Isolate services before removing facilities
- Reinstate affected access and finishes
Inspection controls
- Removal list, waste tickets and returned condition
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________