Skip to content

Library / Documents

Document library

Every catalogue record, marked Available when a file can be downloaded now and Planned when it is not written yet. Available files are listed first.

170 documents · 170 available

Method StatementACT-001

Site Mobilisation and Site Establishment Method Statement

Site Mobilisation and Site Establishment · Project Management

DOCXPDFR00Available

Method StatementACT-002

Setting Out and Survey Works Method Statement

Setting Out and Survey Works · Project Management

DOCXPDFR00Available

Method StatementACT-003

Site Hoarding and Gates Installation Method Statement

Site Hoarding and Gates Installation · Project Management

DOCXPDFR00Available

Method StatementACT-004

Temporary Site Offices and Facilities Method Statement

Temporary Site Offices and Facilities · Project Management

DOCXPDFR00Available

Method StatementACT-005

Temporary Power and Water Supply Method Statement

Temporary Power and Water Supply · Project Management

DOCXPDFR00Available

Method StatementACT-006

Tower Crane Installation, Climbing and Dismantling Method Statement

Tower Crane Installation, Climbing and Dismantling · Project Management

DOCXPDFR00Available

Method StatementACT-007

Passenger/Material Hoist Installation and Dismantling Method Statement

Passenger/Material Hoist Installation and Dismantling · Project Management

DOCXPDFR00Available

Method StatementACT-008

Mobile Crane Lifting Operations Method Statement

Mobile Crane Lifting Operations · Project Management

DOCXPDFR00Available

Method StatementACT-009

Scaffolding Erection and Dismantling Method Statement

Scaffolding Erection and Dismantling · Project Management

DOCXPDFR00Available

Method StatementACT-010

Temporary Works (Propping and Back-Propping) Method Statement

Temporary Works (Propping and Back-Propping) · Project Management

DOCXPDFR00Available

Method StatementACT-011

Traffic Management and Site Logistics Method Statement

Traffic Management and Site Logistics · Project Management

DOCXPDFR00Available

Method StatementACT-012

Demobilisation and Site Clearance Method Statement

Demobilisation and Site Clearance · Project Management

DOCXPDFR00Available

Method StatementACT-013

Site Clearance and Grubbing Method Statement

Site Clearance and Grubbing · Civil

DOCXPDFR00Available

Method StatementACT-014

Excavation Works Method Statement

Excavation Works · Civil

DOCXPDFR00Available

Method StatementACT-015

Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) Method Statement

Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles) · Civil

DOCXPDFR00Available

Method StatementACT-016

Diaphragm Wall Construction Method Statement

Diaphragm Wall Construction · Civil

DOCXPDFR00Available

Method StatementACT-017

Dewatering Works Method Statement

Dewatering Works · Civil

DOCXPDFR00Available

Method StatementACT-018

Bored Piling Works Method Statement

Bored Piling Works · Civil

DOCXPDFR00Available

Method StatementACT-019

Pile Load Testing (Static / Dynamic) Method Statement

Pile Load Testing (Static / Dynamic) · Civil

DOCXPDFR00Available

Method StatementACT-020

Pile Integrity Testing Method Statement

Pile Integrity Testing · Civil

DOCXPDFR00Available

Method StatementACT-021

Pile Head Cutting and Trimming Method Statement

Pile Head Cutting and Trimming · Civil

DOCXPDFR00Available

Method StatementACT-022

Blinding Concrete Method Statement

Blinding Concrete · Civil

DOCXPDFR00Available

Method StatementACT-023

Below-Grade Waterproofing (Membrane) Method Statement

Below-Grade Waterproofing (Membrane) · Civil

DOCXPDFR00Available

Method StatementACT-024

Anti-Termite Treatment Method Statement

Anti-Termite Treatment · Civil

DOCXPDFR00Available

Method StatementACT-025

Raft Foundation Construction Method Statement

Raft Foundation Construction · Civil

DOCXPDFR00Available

Method StatementACT-026

Pile Caps and Grade Beams Method Statement

Pile Caps and Grade Beams · Civil

DOCXPDFR00Available

Method StatementACT-027

Backfilling and Compaction Method Statement

Backfilling and Compaction · Civil

DOCXPDFR00Available

Method StatementACT-028

Soil Compaction Testing (Field Density Test) Method Statement

Soil Compaction Testing (Field Density Test) · Civil

DOCXPDFR00Available

Method StatementACT-029

Formwork for Columns and Walls Method Statement

Formwork for Columns and Walls · Structural

DOCXPDFR00Available

Method StatementACT-030

Formwork for Slabs and Beams Method Statement

Formwork for Slabs and Beams · Structural

DOCXPDFR00Available

Method StatementACT-031

Core Wall Jump Form / Climbing Form System Method Statement

Core Wall Jump Form / Climbing Form System · Structural

DOCXPDFR00Available

Method StatementACT-032

Table Form / Flying Form System Method Statement

Table Form / Flying Form System · Structural

DOCXPDFR00Available

Method StatementACT-033

Reinforcement Steel Fixing Method Statement

Reinforcement Steel Fixing · Structural

DOCXPDFR00Available

Method StatementACT-034

Mechanical Couplers (Rebar Splicing) Method Statement

Mechanical Couplers (Rebar Splicing) · Structural

DOCXPDFR00Available

Method StatementACT-035

Concrete Pouring (General) Method Statement

Concrete Pouring (General) · Structural

DOCXPDFR00Available

Method StatementACT-036

Mass Concrete Pouring (Raft) Method Statement

Mass Concrete Pouring (Raft) · Structural

DOCXPDFR00Available

Method StatementACT-037

Concrete Pumping Works Method Statement

Concrete Pumping Works · Structural

DOCXPDFR00Available

Method StatementACT-038

Hot Weather Concreting Method Statement

Hot Weather Concreting · Structural

DOCXPDFR00Available

Method StatementACT-039

Concrete Curing Method Statement

Concrete Curing · Structural

DOCXPDFR00Available

Method StatementACT-040

Construction Joints and Waterstops Method Statement

Construction Joints and Waterstops · Structural

DOCXPDFR00Available

Method StatementACT-041

Post-Tensioned Slabs Method Statement

Post-Tensioned Slabs · Structural

DOCXPDFR00Available

Method StatementACT-042

Precast Concrete Elements Installation Method Statement

Precast Concrete Elements Installation · Structural

DOCXPDFR00Available

Method StatementACT-043

Hollow Core Slab Installation Method Statement

Hollow Core Slab Installation · Structural

DOCXPDFR00Available

Method StatementACT-044

Concrete Repair Works Method Statement

Concrete Repair Works · Structural

DOCXPDFR00Available

Method StatementACT-045

Core Drilling and Coring Tests Method Statement

Core Drilling and Coring Tests · Structural

DOCXPDFR00Available

Method StatementACT-046

Embedded Items and Sleeves Installation Method Statement

Embedded Items and Sleeves Installation · Structural

DOCXPDFR00Available

Method StatementACT-047

Staircase Construction Method Statement

Staircase Construction · Structural

DOCXPDFR00Available

Method StatementACT-048

Shear Walls and Lift Cores Method Statement

Shear Walls and Lift Cores · Structural

DOCXPDFR00Available

Method StatementACT-049

Water Tanks (Concrete) Construction Method Statement

Water Tanks (Concrete) Construction · Structural

DOCXPDFR00Available

Method StatementACT-050

Formwork Striking and Removal Method Statement

Formwork Striking and Removal · Structural

DOCXPDFR00Available