ACT-170 / RA / R00
Project Handover — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Check signed prerequisites | — | — | — | — | — |
| Reconcile spares and obligations | — | — | — | — | — |
| Obtain formal transfer | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: acceptance dossier, keys, asset list and delivery record
Task risk review
- Check signed prerequisites
- Reconcile spares and obligations
- Obtain formal transfer
Assessment prompts
- Assess interfaces relevant to this location: Live systems, occupancy and simultaneous commissioning activities.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________