ACT-170 / CHK / R00
Project Handover — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Check signed prerequisites | — | — | — | — | — |
| Reconcile spares and obligations | — | — | — | — | — |
| Obtain formal transfer | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: acceptance dossier, keys, asset list and delivery record
Inspection points
- Check signed prerequisites
- Reconcile spares and obligations
- Obtain formal transfer
Records and release
- Transfer date, certificates, custodian, exclusions and signatures
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________