ACT-170 / ITP / R00
Project Handover — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Check signed prerequisites | — | — | — | — | — |
| Reconcile spares and obligations | — | — | — | — | — |
| Obtain formal transfer | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: acceptance dossier, keys, asset list and delivery record
Inspection sequence
- Check signed prerequisites
- Reconcile spares and obligations
- Obtain formal transfer
Inspection controls
- Transfer date, certificates, custodian, exclusions and signatures
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________