ACT-140 / RA / R00
Earthing and Bonding System — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Verify design and routes | — | — | — | — | — |
| Document buried connections | — | — | — | — | — |
| Witness tests | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: earth conductors, bars, electrodes and clamps
Task risk review
- Verify design and routes
- Document buried connections
- Witness tests
Assessment prompts
- Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________