ACT-140 / MS / R00
Earthing and Bonding System Method Statement
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
Scope and project location
- Activity: Earthing and Bonding System. Discipline: Electrical.
- Applicable work limits / project / area / grid / exclusions: ____________________
Approved references and technical limits
- Drawing and revision / specification clause / approved ITP: ____________________
- Approved engineering design / manufacturer procedure / technical limits / project instructions where applicable: ____________________
- Permits / isolations / specialist and authority releases as applicable: ____________________
Responsibilities and resources
- Supervisor / specialist lead / safety lead / QC / consultant witness: ____________________
- Materials and equipment: earth conductors, bars, electrodes and clamps.
- Approved submittals / equipment IDs and calibration: ____________________
Prerequisites and work sequence
- Prior-work release / interfaces / access / pre-task briefing: ____________________
- 1. Verify design and routes.
- 2. Document buried connections.
- 3. Witness tests.
Inspection stages and required records
- Checks and evidence: Electrode locations, continuity and resistance certificates.
- Before / during / final inspection: area, acceptance clause, frequency, hold or witness point and record reference: ____________________
- Nonconformance / corrective action / retest reference: ____________________
Approval
- Prepared by / reviewed by / approved by / signatures and dates: ____________________