ACT-140 / ITP / R00
Earthing and Bonding System — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Verify design and routes | — | — | — | — | — |
| Document buried connections | — | — | — | — | — |
| Witness tests | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: earth conductors, bars, electrodes and clamps
Inspection sequence
- Verify design and routes
- Document buried connections
- Witness tests
Inspection controls
- Electrode locations, continuity and resistance certificates
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________