| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Verify design and routes | — | — | — | — | — |
| Document buried connections | — | — | — | — | — |
| Witness tests | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: earth conductors, bars, electrodes and clamps
Inspection points
- Verify design and routes
- Document buried connections
- Witness tests
Records and release
- Electrode locations, continuity and resistance certificates
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________