Skip to content

Risk AssessmentACT-131-RAR00Available

MV Cable Installation and Testing — Risk Assessment

MV Cable Installation and TestingElectrical

ACT-131 / RA / R00

MV Cable Installation and Testing — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Verify cable and certified accessories—————
Witness approved pull and terminations—————
Get test release—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: MV cables, pulling gear and specialist test instruments

Task risk review

  • Verify cable and certified accessories
  • Witness approved pull and terminations
  • Get test release

Assessment prompts

  • Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3