Inspection and Test PlanACT-131-ITPR00Available

MV Cable Installation and Testing — Inspection and Test Plan

MV Cable Installation and TestingElectrical

ACT-131 / ITP / R00

MV Cable Installation and Testing — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Verify cable and certified accessories—————
Witness approved pull and terminations—————
Get test release—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: MV cables, pulling gear and specialist test instruments

Inspection sequence

  • Verify cable and certified accessories
  • Witness approved pull and terminations
  • Get test release

Inspection controls

  • Drum lengths, pulling log and pre-energisation certificates
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________