MV Cable Installation and Testing — Inspection Checklist

MV Cable Installation and TestingElectrical

ACT-131 / CHK / R00

MV Cable Installation and Testing — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Verify cable and certified accessories—————
Witness approved pull and terminations—————
Get test release—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: MV cables, pulling gear and specialist test instruments

Inspection points

  • Verify cable and certified accessories
  • Witness approved pull and terminations
  • Get test release

Records and release

  • Drum lengths, pulling log and pre-energisation certificates
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.