ACT-131 / CHK / R00
MV Cable Installation and Testing — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Verify cable and certified accessories | — | — | — | — | — |
| Witness approved pull and terminations | — | — | — | — | — |
| Get test release | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: MV cables, pulling gear and specialist test instruments
Inspection points
- Verify cable and certified accessories
- Witness approved pull and terminations
- Get test release
Records and release
- Drum lengths, pulling log and pre-energisation certificates
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________