ACT-107 / TEST / R00
Testing, Adjusting and Balancing Field Record
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Test point | Design value | Measured value | Unit | Final setting | Result | Evidence |
|---|---|---|---|---|---|---|
| Supply air terminal | — | — | — | — | — | — |
| Return air terminal | — | — | — | — | — | — |
| Outdoor air intake | — | — | — | — | — | — |
| Exhaust terminal | — | — | — | — | — | — |
| Chilled-water branch | — | — | — | — | — | — |
System readiness
- System ID / approved schematic revision / mode / installed equipment and TAB procedure: ____________________
- Check open terminal paths, clean filters, accessible dampers and calibrated instruments. Record test conditions and unit configuration.
Readings and disposition
- Record design versus measured values, approved tolerances, final setting and any unresolved shortfall by test point.
- Instrument IDs / calibration / witness / corrective actions and retest: ____________________