Testing, Adjusting and Balancing (TAB) — Inspection and Test Plan

Testing, Adjusting and Balancing (TAB)HVAC

ACT-107 / ITP / R00

Testing, Adjusting and Balancing (TAB) — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Confirm readiness and design values—————
Establish operating modes—————
Adjust terminals and branches—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: calibrated airflow and hydronic instruments

Inspection sequence

  • Confirm readiness and design values
  • Establish operating modes
  • Adjust terminals and branches

Inspection controls

  • Design versus measured readings, settings, calibration and deviations
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________