Testing, Adjusting and Balancing (TAB) — Risk Assessment

Testing, Adjusting and Balancing (TAB)HVAC

ACT-107 / RA / R00

Testing, Adjusting and Balancing (TAB) — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Confirm readiness and design values—————
Establish operating modes—————
Adjust terminals and branches—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: calibrated airflow and hydronic instruments

Task risk review

  • Confirm readiness and design values
  • Establish operating modes
  • Adjust terminals and branches

Assessment prompts

  • Assess interfaces relevant to this location: Stored energy, access and equipment handling.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________