ACT-107 / CHK / R00
Testing, Adjusting and Balancing (TAB) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm readiness and design values | — | — | — | — | — |
| Establish operating modes | — | — | — | — | — |
| Adjust terminals and branches | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: calibrated airflow and hydronic instruments
Inspection points
- Confirm readiness and design values
- Establish operating modes
- Adjust terminals and branches
Records and release
- Design versus measured readings, settings, calibration and deviations
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________