Risk AssessmentACT-087-RAR00Available

Stone Cladding (Dry Fix) — Risk Assessment

Stone Cladding (Dry Fix)Architectural

ACT-087 / RA / R00

Stone Cladding (Dry Fix) — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Survey supports—————
Inspect fixings—————
Align stone preserving cavity and movement joints—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: stone panels, brackets, anchors and shims

Task risk review

  • Survey supports
  • Inspect fixings
  • Align stone preserving cavity and movement joints

Assessment prompts

  • Assess interfaces relevant to this location: Falling objects, lifting and access at height.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________