ACT-087 / ITP / R00
Stone Cladding (Dry Fix) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Survey supports | — | — | — | — | — |
| Inspect fixings | — | — | — | — | — |
| Align stone preserving cavity and movement joints | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: stone panels, brackets, anchors and shims
Inspection sequence
- Survey supports
- Inspect fixings
- Align stone preserving cavity and movement joints
Inspection controls
- Stone batch, anchor tests, restraint and final survey
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________