Stone Cladding (Dry Fix) — Inspection Checklist

Stone Cladding (Dry Fix)Architectural

ACT-087 / CHK / R00

Stone Cladding (Dry Fix) — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Survey supports—————
Inspect fixings—————
Align stone preserving cavity and movement joints—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: stone panels, brackets, anchors and shims

Inspection points

  • Survey supports
  • Inspect fixings
  • Align stone preserving cavity and movement joints

Records and release

  • Stone batch, anchor tests, restraint and final survey
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.