Utility Connections (Water / Sewer / Power / Telecom) — Risk Assessment

Utility Connections (Water / Sewer / Power / Telecom)Infrastructure

ACT-164 / RA / R00

Utility Connections (Water / Sewer / Power / Telecom) — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Agree authority boundaries—————
Coordinate authorised tie-in—————
Inspect before backfill—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: utility connections, chambers, fittings and meters

Task risk review

  • Agree authority boundaries
  • Coordinate authorised tie-in
  • Inspect before backfill

Assessment prompts

  • Assess interfaces relevant to this location: Underground utilities, public access and mobile plant.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.