ACT-164 / CHK / R00
Utility Connections (Water / Sewer / Power / Telecom) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Agree authority boundaries | — | — | — | — | — |
| Coordinate authorised tie-in | — | — | — | — | — |
| Inspect before backfill | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: utility connections, chambers, fittings and meters
Inspection points
- Agree authority boundaries
- Coordinate authorised tie-in
- Inspect before backfill
Records and release
- Approvals, tests, coordinates and meter references
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________