ACT-164 / ITP / R00
Utility Connections (Water / Sewer / Power / Telecom) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Agree authority boundaries | — | — | — | — | — |
| Coordinate authorised tie-in | — | — | — | — | — |
| Inspect before backfill | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: utility connections, chambers, fittings and meters
Inspection sequence
- Agree authority boundaries
- Coordinate authorised tie-in
- Inspect before backfill
Inspection controls
- Approvals, tests, coordinates and meter references
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________