Skip to content

Inspection and Test PlanACT-163-ITPR00Available

Boundary Wall and Gates — Inspection and Test Plan

Boundary Wall and GatesInfrastructure

ACT-163 / ITP / R00

Boundary Wall and Gates — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Confirm legal boundary—————
Release supports—————
Install wall and operational gates—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: boundary masonry, posts, gates and controls

Inspection sequence

  • Confirm legal boundary
  • Release supports
  • Install wall and operational gates

Inspection controls

  • Offsets, stability, clearance, safety devices and gate cycle
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3