ACT-163 / CHK / R00
Boundary Wall and Gates — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm legal boundary | — | — | — | — | — |
| Release supports | — | — | — | — | — |
| Install wall and operational gates | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: boundary masonry, posts, gates and controls
Inspection points
- Confirm legal boundary
- Release supports
- Install wall and operational gates
Records and release
- Offsets, stability, clearance, safety devices and gate cycle
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________