ACT-157 / ITP / R00
Road Works (Sub-base / Base / Asphalt) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release formation | — | — | — | — | — |
| Test base courses | — | — | — | — | — |
| Place and protect asphalt | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: aggregate, asphalt, compaction plant and survey tools
Inspection sequence
- Release formation
- Test base courses
- Place and protect asphalt
Inspection controls
- Density, load temperature, thickness, drainage and levels
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________