Road Works (Sub-base / Base / Asphalt) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release formation | — | — | — | — | — |
| Test base courses | — | — | — | — | — |
| Place and protect asphalt | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: aggregate, asphalt, compaction plant and survey tools
Inspection points
- Release formation
- Test base courses
- Place and protect asphalt
Records and release
- Density, load temperature, thickness, drainage and levels
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________