ACT-155 / RA / R00
Lift Shaft Preparation and Survey — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Transfer vertical datum | — | — | — | — | — |
| Survey each opening | — | — | — | — | — |
| Resolve deviations before handover | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: shaft survey instruments, benchmarks and opening schedule
Task risk review
- Transfer vertical datum
- Survey each opening
- Resolve deviations before handover
Assessment prompts
- Assess interfaces relevant to this location: Open shafts, moving equipment and stored energy.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________