Risk AssessmentACT-155-RAR00Available

Lift Shaft Preparation and Survey — Risk Assessment

Lift Shaft Preparation and SurveySpecialist Systems

ACT-155 / RA / R00

Lift Shaft Preparation and Survey — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Transfer vertical datum—————
Survey each opening—————
Resolve deviations before handover—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: shaft survey instruments, benchmarks and opening schedule

Task risk review

  • Transfer vertical datum
  • Survey each opening
  • Resolve deviations before handover

Assessment prompts

  • Assess interfaces relevant to this location: Open shafts, moving equipment and stored energy.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________