ACT-155 / ITP / R00
Lift Shaft Preparation and Survey — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Transfer vertical datum | — | — | — | — | — |
| Survey each opening | — | — | — | — | — |
| Resolve deviations before handover | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: shaft survey instruments, benchmarks and opening schedule
Inspection sequence
- Transfer vertical datum
- Survey each opening
- Resolve deviations before handover
Inspection controls
- Pit, overhead, shaft plumb and embedded interfaces
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________