Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Transfer vertical datum—————
Survey each opening—————
Resolve deviations before handover—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: shaft survey instruments, benchmarks and opening schedule

Inspection sequence

  • Transfer vertical datum
  • Survey each opening
  • Resolve deviations before handover

Inspection controls

  • Pit, overhead, shaft plumb and embedded interfaces
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________